Fabrication workshop (20 FTE) • 05/10/2024

    Lean Improvements Lift Throughput with No CapEx

    Introduced cells, WIP limits, and SMED to increase throughput by 19% and cut lead time by 22%.

    Lean Improvements Lift Throughput with No CapEx case study image

    The Challenge

    Batching and long changeovers created bottlenecks and inconsistent quality.

    Our Approach

    • Time-and-motion study and constraint analysis
    • Cell layout, Kanban, and WIP limits to smooth flow
    • SMED workshops to standardise and reduce changeovers

    Solution

    Flow redesign and standard work with simple visual controls delivered measurable throughput gains without capital spend.

    Ready to achieve similar results?

    Book a discovery call or explore Clarity AI for always-on guidance.